Here's some of our fall checklist. Pardon the formatting.
Code:
Dingy Wash, bag & stow
Bring 2 gallons mixed antifreeze
System with hose
Newspaper
Paper towel
Fuel tank Fill Additive (5 oz)
Paper towel
Winterize Engine Antifreeze
Remove: Burgee halyards Stow below
Jib furling line ? in drum
Main furling line ? below
Mainsheet ? ?
Outhaul Leave on boom
Boom Stow below
Loran antenna ? ?
Whisker pole ? ?
Traveler Remove block
Radios & Loran Take home
Cockpit seats ? ?
Ladder ? ?
Dodger ? ?
Batteries ? ?
Tartan Manuals ? ? Thermometer on mast Stow below
Secure: Halyards to the mast
Furler head & tack Jib & main
Disconnect Wires at the base of the mast (07: Fix connector)
Take down & Pack up Dodger
Quote:
Fall Lay-up (In the Cradle)
Empty Dock Box, Secure Slip
Log mileage, engine hours & fuel
Open sea cocks
Pump bilge
Anti freeze head & bilge
Tie open icebox lids (empty)
Remove freezables
Leak suppression
Stand up cushions
Cockpit seats stow below
Open doors, drawers & lockers
Leak suppression
Take home books, linens, soda, etc
Cover winches, binnacle & Hatch Brds.
Remove traveler block & line
Cover Air intake & exhaust
Check for blisters
Oil jack stand screws